MIXING CENTER OF THE NEW B3 UNIT AT KOSTOLAC – electrical and control project documentation in the scope of BASIC and DETAIL DESIGN

Name of contract:   Mixing center of the new B3 unit at the Kostolac power plant (Serbia)
Term of delivery:     2019

SPECIFICATION
We were approached with the opportunity to participate in producing the project documentation for the electrical, instrumentation and control part of the new mixing center of the newly built B3 production unit (the output of the new production unit 350 MW) of a lignite power plant.

The mixing center consists of two parts:
    Ash part – separate ash silo (the mixing center will be located here),
    Lime part – separate technology.
 

SUMMARY

  • The documentation was prepared in the scope/degree of “BASIC DESIGN” (introductory project).
  • The investor’s comment procedure was followed by the elaboration of documentation in the scope/degree of “DETAIL DESIGN” (implementation documentation).
  • It is now in the commenting phase and adjusted for the phase of selecting the contractor for this part.

 

 

 

 